Gulf Area

A large breakwater was built in the Gulf to protect a harbour. The breakwater is located in a severe earthquake zone. The Xbloc armour was applied on a slope of 1:2. The Xblocs were placed using crawler cranes.

Location

Gulf Area

Project milestones

  • Start of Xbloc production: May 2009
  • Start of Xbloc placement: July 2009

Project details

  • Hs = 5.4 m
  • Water depth = 12 m
  • Length of breakwater = 600 m
  • Size of Xblocs = 3, 4 and 5 m3
  • Number of units = 8,000

More images