Kakinada gateway port, India

At the Andhra Pradesh coastline in India the greenfield Kakinada Port is being constructed by Auro Infra Private Limited. The 2 required breakwaters have a total length of 3.5 km and will be protected by around 21,000 Xbloc units. The blocks range in sizes of 2.5 m3, 4 m3, 5 m3 and 7 m3

Location

Kakinada Xbloc

Project milestones

  • First Xbloc produced: March 2024
  • First Xbloc placed: January 2025

Project details

  • Hs = 5.5 m
  • Length of south breakwater = 2.800 m
  • Length of north breakwater = 700 m
  • Size of Xbloc = 2.5 m3, 4 m3, 5 m3 and 7 m3
  • Number of units = 21,000

More images