At the Mediterranean Sea coastline of Barcelona in Spain, the existing breakwater of Marina Port Forum is being upgraded. This project is led by Marina Port Forum S.L., Enginyeria Reventos S.L. and Copcisa S.A. The 830 m long breakwater will be reinforced with around 2,600 Xblocs with a volume of 8 m³ as part of the upgrade.