Moín, Costa Rica

In Costa Rica, a consortium of Van Oord and BAM International constructed the Puerto Moín Container Terminal for APM Terminals. The breakwater for this terminal is 1.5km long and is protected by around 14,000 Xblocs with a weight of 10 tons each. Production of the blocks started in August 2015. Van Oord started placement of the blocks on the breakwater in November 2015.

Location

Moín, Costa Rica

Project milestones

  • Start of casting: September 2015
  • Start of Xbloc placement: February 2016

Project details

  • Hs = 5.1 m
  • Length of breakwater = 1.500 m
  • Size of Xblocs = 4.5 m3
  • Number of units = 14.200

Moín Container Terminal, Costa Rica, of VOBAM Consortium