Sandy Bay sea defence lot 1 & 3, Saint Vincent

The projects Sandy Beach Sea Defence Lot 1 & 3 consisted of the construction of two revetments. For Lot 1 wit a revetment length of 270m, approximately 1,600 Xbloc units of 1m3 were needed. For Lot 3 wit a revetment length of 180m, approximately 1,100 Xbloc units were needed. Both projects started in 2023 and were completed in 2025.

Location

Sandy Bay Primary

Project milestones

  • Start of casting: 2023
  • Start of placement: 2023
  • End of placement: 2025 

Project details

  • Length of revetment = 270 m (lot1) & 180 m (lot3)
  • Size of Xbloc used = 1 m3
  • Number of units = 1,600 (lot 1) & 1,100 (lot 3)

More images