Te Ara Tupua, Wellington, New Zealand

The project consists of a shore protection and a small land reclamation for a walking and cycling route along the bay. This is the first project with adjusted XblocPlus units for more natural and ecological appearance. The project consisted of eight structures with a total length of 2,000m XblocPlus revetment including 6,650 units of 1m3. 

Location

Primary Image Te Ara Tupua

Project milestones

  • Start of casting: 2023
  • Start of placement: 2024
  • End of placement: 2025

Project details

  • Hs = 2,73
  • Length of revetment = 2000 m
  • Size of XblocPlus = 1 m3
  • Number of units = 6,650